The door is now installed.
Ceiling framework for the tile is pretty much in for the hall.
Landscaping on the south side is being done.
And on the North side.
Dirt has been added for the lawn of shrubs
that will go next to the building.
Pavers are being added to areas as well.
This is the dirt for the area next to the building.
Trees have been added on the South side.
And an unfortunate bump and the
paver bricks fell quickly,
they were not re-stacked nearly as fast.
The floor is nearly done and
pads still need added to the walls.
No comments:
Post a Comment