Progress continue.
During Women's Conference I was asked by a couple
of ladies that were speculating about what that new
building was going to be and they were sure
it was going to be a parking plaza.
This is the south side.
HVAC ducts are pretty well in now.
A lot more walls are up except on the second level.
The outside bottom area is being prepared for the windows.
The south side outside wall is getting
the final facing.
Looks like insulation is being readied to install.
To date progress on the south. We are trying to figure
out what will be cement and what will be grass.