Cement has been poured on the south side. I don't
know if all of it os done, most likely not since
equipment is still set-up along the building.
1st level walls are starting to be sheet-rocked.
And the 2nd level rooms are starting to have the walls
installed.
The bricking along the East and South
sides is going well also.
Looking through the closest rooms to the playing floor
we can see where the walls are starting to be
taped for mud.
More views of the progress on the brick outside.