So it has been a few days since I have been able to post an update.
The floor has been poured for the court.



There are a number of the beams that are now installed.



The walls of the stairs are completed.




Gravel for the remaining floor is now in and 
the blue plastic barrier installed.













 The beams for the floor of the second floor 
have mostly been installed .

Round beams for the South East corner are in.