As I came in today they were removing the forms
for the west wall in front of the Marriott.
They looked like this when uncovered.
The hole here seems to be for a set of stairs leading
from the east entrance to the Marriott to the outside
of the building.
The North west side walls still being formed.
This is the south side. They have made a place to
bring equipment into the center area.
The elevator shaft enclosure is almost completed.
North wall progress.
Last of the blocks to go on the shaft.
Not sure for what this vestibule will be used.
Rebar apparently for the top of the elevator shaft.
Four views from the East side of the annex.
You can see where they are preparing to put cement
into the rest of the block for the elevator.