The south east section ready to be poured.
While they are installing the screws for the seat in the first pour.
Rebar being put into the other sections.
One of the new handicap seating areas with a hole into
the room on the other side.
This is the ceiling area of part of the west tunnel
where the cement was removed and it became
just a gaping hole. Here covered with wood
while installing the rebar.
Some of the dirt floor areas with old cement removed.
Forms for the steps.
Exposed dirt at the top areas where cement was on
the original girt areas.