Thursday, December 31, 2015

Putting up the wall forms

Walls for the walkway from the annex to the
 MC (old East stairs).




Tuesday, December 29, 2015

Practice Facility update

The footings are poured and the walls going up
for the hall between the two buildings.




 The fill dirt is also starting to be brought to the south side.


A look from the East side.

Beautiful Wildlife in my yard

My trail cam caught images of the deer and then I saw them
Here are the images form both.
 This buck was caught last night as he strode past my camera.

Then late this afternoon this doe and 3 bucks came to visit.







These two stopped right there and I have a bunch of images 
of just this potion of their bodies. 

Later as they left I was able to get a little more.




Then after I spotted them and got out my Canon
then these are the images I was able to get 
as I kneeled outside in the snow on my car parking pad.








I had to move around the backside of the house to capture
the following images.



This is where they are in relation to my house. 










Then a few parting shots.





Friday, December 25, 2015

Practice Facility update Dec 22, 2015 progress

More of the footing have been made ready.